Listen to the sound clip 60 men would take 12 days to load it onto 200 trucks. from James Bond: Goldfinger (1964):
60 men would take 12 days to load it onto 200 trucks.
Go to the full soundboard
with more sound clips
Search
Listen to the sound clip 60 men would take 12 days to load it onto 200 trucks. from James Bond: Goldfinger (1964):
60 men would take 12 days to load it onto 200 trucks.